Bird Machine Information
Final Inspection Report
Final Inspection Report documents the construction of a Comprehensive Remedial Action that is expected to be a Permanent Solution for the Site.
Public Involvement Plan Meeting for the Former Bird Machine Site, 100 Neponset Street, Walpole, MA, RTN 4-3024222
July 31, 2012 7:00 PM Main Meeting Room Town Hall
- July 31, 2012 Meeting Notice
- July 31, 2012 Slide Presentation
- DRAFT Phase IV Final Inspection Report
- Figures 1-3
- Figures 4-10
- Figures 11-16
- FIR Transmittal Letter
Remedy Implementation Plan
These PDFs include a document and transmittal letter (including executive summary) that are being sent to MassDEP and the information repository at the Public Library, and slides that were presented at the 3/14/12 Public Meeting. The attached Final Phase IV Remedy Implementation Plan presents the design for a Comprehensive Remedial Action that is expected to be a Permanent Solution for the Site.
- RIP Transmittal Letter
- FINAL Phase IV Remedy Implementation Plan
- March 14, 2012 Slide Presentation
- Figures 1-3
- Figures 4-8
- Figures 9-14
Draft Remedy Implementation Plan (RIP) Presentation
On March 14, 2012 at 7:00 PM in the Main Meeting Room at the Town Hall AMEC and Baker Hughes Inc. will present a summary of the Draft Remedy Implementation Plan (RIP) and be available to answer questions on the document. The RIP will be in the Walpole Town Library and the MassDEP public information repositories by February 29.