Pre-dredge Pond
Project sign
Installing the timber road to access dredge materials
Timber road installation 10-9-18
Timber road 10-10-18
10-12-18 Timbers stacked 3-4 deep.
10-12-18 Beginning to stockpile dredge material for dewatering
Dewatering structure installation 10-16-18
Dewatering structure 10-17-18
Dewatering outflow at Bridge 10-17-18
Dredging well underway 10-22-18
10-22-18
10-22-18
10-23-18
Dewatering pump in middle of pond
10-23-18 Looking towards Town Hall from pump
10-23-18 Looking towards Diamond Street from pump
Route 1A disposal site
Looking towards School Street
10-26-18 from School Street
10-26-18 Dredging
Disposal site sign
Wheel Scrubber at disposal site
November Rain filled pond. Bigger pump installed.
Dewatering pipe at bridge
11-19-18 up and excavating again.
11-28-18
11-28-18
11-26-18
dewatering pipes
11-27-18
11-27-18
12-13-18
12-13-18
12-13-18
12-18-18
1-2-19 Pond filled after dredge
East street side 1-2-19
Common street side 1-2-19
Looking across pond towards East Street
Looking towards School Street at Common Street side of Pond
1/29/19 Pond elevation up
1/29/19
1/29/19 - cleaning in front of dam
1/29/19 clean in front of dam