9 Pinnacle Drive (Pinnacle Point)

Address: 9 Pinnacle Drive (Pinnacle Point)

Applicant: Louis Petrozzi

Representative: Wall Street Development Corp.

Application Type: Notice of Intent 

DEP #: 315-1331


Submittal  2026-07-06

Summary letter

Revised 2026-07-01 Site Development plan

Stormwater calculation supplemental

Submittal  2026-06-09

2026-06-08 WallStreet Cover letter

Applicant's Response to Beal and Thomas Peer 03-04-2026 Review letter

Revised NOI Form 3

 Special Permit /Site Development Plan revised May 14, 2026,  Sheets 1-15, Appendix A & B Glossa Engineering

Eco Tec Memo: Degraded designation of lower (north) slope dated 04/30/2026

Submittal  February 6, 2026

Cover Letter-Wall Street Development 02-05-2026

1. Revised NOI WPA Form 01-26-2026

2. Site Development Plan - Revised 01-29-2026

3. Revised Stormwater Report -Glossa Engineering 01-28-2026

4. Invasive Management Protocol Eco-Tec 01-14-2026

5. Wetland Standards Evaluation EcoTec 01-14-2026

6. Report Eco Tec - Beals and Thomas Response -Comment 11 11-12-2025

7. Redevelopment Previously Developed RFA area- Eco Tec 11-12-2025

8. Waiver Request Wall Street Development corp 25-foot Buffer 11-12-2025

9. Report Beals and Thomas 10-02-2025

10. Applicant's Response to Beals and Thomas Report 11-08-2025

11. Field Delineation & Soil Investigation Report - Eco Tec 07-29-2025

12. Soil testing and Evaluation Report - Glossa Engineering 07-28-2025

13. Wall street Development Memo - River front Exemption - 03-07-2025

14. , 15, 16 Photos (complied) Invasive species, historic dumping,existing structures 

Submittal January 14, 2026

Site Development Plan - Revised 01-12-2026

Invasive Management Protocol Eco-Tec 01-14-2026

Wetland Standards Evaluation EcoTec 01-14-2026

Submittal Novemeber 13, 2025

Applicant's Response to Peer Review dated 11.08.2025

EcoTech Response to Peer Review dated 11.12.2025

EcoTech Memo Regarding Redevelopment within the Riverfront Area dated 11.12.2025

Site Plan with Comments from Applicant - 10.27.2025

Site Plan Revised - 10.27.2025

Stormwater Report Revised - 10.27.2025

Stormwater Plan Revised - 10.27.2025

Variance Request from Applicant - 11.12.2025

 

Peer Review Reports and Applicant's Responses

3-4-2026 Peer Review Revision 5 Review – Notice of Intent (NOI) MassDEP # 315-1331 by Beals and Thomas 

10-02-2025- Peer Review Notice of Intent (NOI) DEP # 315-1331 by Beals and Thomas 

Original submittal 

Application

Plans

7/22/2025 - NOI Special Permit/ Site Development Plan - Revised

7/22/2025 - Special Permit/ Site Development Plan - Revised 

05/08/2025 - Special Permit/ Site Development Plan Part 1 - Revised

05/08/2025 - Special Permit/ Site Development Plan Part 2 - Revised

11/08/2024 - Post Development Watershed Plan - Revised

11/14/2024 - Special Permit/ Site Development Plan - Original Plan Submitted with Application

05/31/2024 - Pre-Development Watershed Plan - Revised

04/22/2025 - Proposed Clean-up 

Stormwater/ Drainage

Consultant Reports

Decisions

Appeals

Previous Filings